Combined Heat & Power Plant (CHP) of 110MW, Ljubljana

Description

CUSTOMER

JANVO PODJETJE ENERGETIKA LJUBLJANA

LOCATION

Slovenia

SECTOR

Energy Projects

CATEGORY

Gas Turbines / Combined Cycle

START

2019

STATUS

In progress

Project Summary

The scope of  the project includes the engineering, procurement and construction (EPC) of a new Combined Heat and Power (CHP) plant with total electrical power output of 110MW in Ljubljana, Slovenia, substituting to a large extent coal with natural gas, thus reducing coal consumption by 70%.

It also includes the supply, installation and commissioning of 2 Siemens gas turbines and 2 heat recovery steam generators with pertaining equipment, including all necessary construction works and pipeline connections to the existing steam turbine and to the points of contact with the remaining existing devices.

 

BRIEF DESCRIPTION PDF 147KB

GAS TURBINES / COMBINED CYCLE

Ag. Nikolaos CCGT, 826 MW Combined Cycle

The new CCGT station of 826MW, is one of the largest natural gas fired powered combined cycle (Combined Cycle Gas Turbine – CCGT) power stations in Europe, is currently under construction within the Ag.

VIEW MORE